Global & Industrial Case Studies
From heavy machinery assembly bays to outdoor precast concrete yards, explore how Santo Crane material handling systems solve demanding lifting challenges.
Turnkey 50-Ton Double Girder Crane System for Heavy Equipment Manufacturing
Project Scope
The client required a dual-crane material handling system to transport large fabricated structural assemblies across a 350-foot manufacturing bay. Key challenges included stringent runway deflection limits and the requirement to flip 40-ton weldments safely in mid-air using synchronized hoists.
Engineered Solution
Santo Crane provided two custom QD Series 50/10-ton Double Girder Cranes featuring:
- Synchronized radio tandem controls allowing a single operator to drive both cranes simultaneously for oversized long loads.
- Auxiliary 10-ton high-speed hoist dedicated to part manipulation and rapid tool repositioning.
- Full Schneider VFD drives on bridge and trolley for millimetric positioning accuracy.
Client Outcome
Installation was completed on schedule with direct technical support from our US office, achieving zero lost-time incidents and increasing daily bay throughput by over 35%.
Have a Similar Industrial Lifting Challenge?
Our technical sales team can review your building column spacing and produce a custom proposal.